Cauta job
Titlu job, cuvant-cheie sau nume companie
In Oras / Judet / Tara

ALSTOM TRANSPORT SA

4.26 din 54 ratinguri

Strada Răzoare, 32, București, România

Aplica Urmareste

We create smart innovations to meet the mobility challenges of now and the future. We design and manufacture a complete range of transportation systems, from high-speed trains to electric buses, autonomous subways, signalling and digital mobility solutions. Joining us means joining a truly global community of 3400 people dedicated to solving real-world mobility challenges and achieving international projects with sustainable local impact.

Alstom in Romania has been presentfor over 20 years employing today around 450eople. Alstom, registered major success in infrastructure, signaling and also services. The long term service agreement for the maintenance of the rolling stock of Metrorex is a major reference and shows the expertise of Alstom in this field. Alstom will continue to grow his business in Romania proposing further services for the local market and export, creating regional hub in Services and Signaling.
The Simeria Sighisoara Project is part of the program of rehabilitation of the line “Simeria– Sighisoara” (160 km) that is part of the European Corridor IV. The purpose of the project is to increase the running speed from 120 km/h to 160 km/h. The increase of the running speed requires the implementation of “the signalling code with four indications on BLA distances” and of “the signalling system with multi-step speed (MSS) in stations”. The home signals and the departure signals in each station will be relocated, because of the railway track systematization works. The existing train speed control and automatic stopping system (INDUSI) will be maintained for the trains running at speeds up to 120km/h that are not equipped with on-board ETCS unit (OBU). At “green” and “Blinking green” indications, the 500 Hz andHz indicators will be passive. For the national and international trains running at speeds up to 160km/h, and equipped with on-board ETCS unit (OBU), the ETCS Level 2 system with GSM-R will be implemented. This system transmits the movement authorization, the speed profile, etc, by GSM-R, to the on-board ETCS unit that controls the train speed.

Aceasta companie nu are joburi disponibile momentan.